蓝月亮精选料免费大全

耙斗装岩机
Scraper rock mainly used in engineering Tunneling coal, mining, tunnel or the like together with the tub skip loading operation, it is to increase the driving speed, to realize a major heavy mechanized excavation equipment.

Features of Bucket Rock Loader

The main part of the rake bucket rock loader adopts planetary gear transmission. This series of rake bucket rock loader has the characteristics of high rock loading efficiency, simple structure, good reliability, convenient operation and wide application range. Rake bucket rock loader is not only used for level roads, but also can be used in inclined roads below 30 degrees. It is a major mechanical equipment to increase the speed of road driving and realize the mechanization of roadway driving. The harrow bucket rock loader has a pneumatic cart cylinder. After the mine cart is full, the heavy cart can be pushed out with a pneumatic cart cylinder to reduce the labor intensity of the workers, shorten the transfer time and increase the speed of excavation.

P-type harrow bucket rock loader

The P series harrow bucket rock loader is suitable for various metal mines, non-metal mines, coal mines, railway culverts, water conservancy and other construction projects. It is equipped with a mine cart or bucket for rock loading operations during tunneling. It can not only be used in flat roads, but also in inclined roads with inclination angles less than 30 degrees, or roadways with turns and corners up to 90 degrees, and can also perform parallel operations of the driving process at the same time to improve the speed of driving. Electrical equipment has explosion-proof performance and can be used in mines with coal dust and gas.

Basic parameters of P-type bucket rock loader
The P-15B harrow bucket rock loader is suitable for roadways with a clear height of more than 2 meters (a clear cross section of 4.5 square meters or more).
P-30B harrow bucket rock loader is suitable for use in roadways with a clear height of more than 2 meters (more than 6 square meters in net section).
P-60B harrow bucket rock loader is suitable for roadways with a clear height of more than 2.4 meters (with a clear cross section of 8 square meters or more).
The P-90B rake bucket rock loader is suitable for use in roadways with a clear height of more than 3 meters (with a clear section of more than 12 square meters).
P-120B harrow bucket rock loader can be used for roadways with a net height of more than 3 meters (net cross section of more than 16 square meters)

耙斗装岩机
Model parameters unit The main parameters
Product number P-15B Bucket Rock Loader P-30B Bucket Rock Loader P-60B Rake bucket rock loader P-90B Bucket Rock Loader P-120B Bucket Rock Loader P-150B Bucket Rock Loader
Bucket volume 0.15 0.30 0.60 0.90 1.20 1.5
Technical productivity M³ / H 15-20 35-50 70-110 95-140 120-180 150-220
rule MM 600 600 | 900 600 | 900 600 | 900 600 | 900 1500
Traction of main rope KN 7.2-10.4 12.3-18.5 20.0-28.0 31.0-50.0 37.0-55.0 52.0-72.0
Wire rope diameter MM 12.5 12.5-15.5 15.5 17.0 18.5 20.0
electric motor power Kw 11 17 30 45 55 75
Operating Voltage V 380 | 660 380 | 660 380 | 660 380 | 660 380 | 660 380 | 660
Dimensions do not include bezel long MM 5500 6110 6800 8610 10550 11000
width MM 1170 1305 1850 2050 2250 2400
high MM 1800 2000 2350 27450 2870 3000
Gross weight T 2.5 4.75 6.50 9.80 12.50 15
Inspection report P-15B耙斗装岩机检验报告 P-30B耙斗装岩机检验报告 P-60B耙斗装岩机检验报告 P-90B耙斗装岩机检验报告 P-120B耙斗装岩机检验报告 P-150B耙斗装岩机检验报告

Safe Use of Bucket Rock Loader

1) Before driving, a signal must be sent out. No one should stand on both sides of the machine and in the ropeway. The guardrail on the driver's side should be intact and reliable to avoid injury.
2) During operation, only one of the two brakes can be tightly closed and the other one can be loosened, otherwise the bucket will jump and even the wire rope will be broken. During operation, the speed of the wire rope should be kept uniform.
3) When the rake bucket is raking the rock, if the obstacle is too large or overloaded, the rake bucket should be retracted 1-2 m and re-raked. Do not forcibly haul, so as to avoid accidents such as broken ropes or burned motors.
4) During work, pay attention to the sound of each part and the temperature of the motor and bearing at all times.
5) The electrical equipment must not burst, and the gas concentration at the working surface should not exceed 0.5%.
6) When loading rocks into a minecart or bucket, do not stack rocks on the chute.
7) Before firing, pull the bucket to the front of the machine to avoid burial. After firing, check the flameproof device, cables and chute before working.
8) When working in turning lanes, there must be a special person to command, especially when the curve exceeds 10 m, 2 special persons should be set up with signals to command, one on the work surface and one on the turn.
9) When loading up and down the mountain, in addition to keeping the 4 pairs of rail clamps in good condition, the necessary reinforcement measures should be taken for the bucket rake according to the size of the tilt angle.

Tips

1) The bucket rock loader is used for more than 30. The slope loading effect of the inclined lane decreases rapidly.
2) At present, the harrow bucket rock loader does not have its own mechanism. Mobility is not flexible enough.
3) The bucket rock loader is severely worn due to wire rope traction. Therefore, the wire rope needs to be replaced frequently.

Other topics

  • Heading Machine Topic

  • Special topic

  • Dumper topic

  • Lifting equipment topic

  • Railway Equipment Topics

  • Hydraulic support topic

  • Shearer topic

  • Minecart topic

  • Support Equipment Topics

  • Special Topics for Rock Drilling Equipment

  • Emulsion Pumping Station

  • Special spray equipment

  • Drainage equipment topic

  • Topics on mining doors

  • Survival cabin topic

  • Security rescue equipment topic

  • Electrical equipment topic

  • Special Topics on Steel Equipment

navigation

online service
Enterprise QQ
hotline
Mobile access
Mobile access

Quick navigation

var _hmt = _hmt || []; (function() { var hm = document.createElement("script"); hm.src = "https://hm.baidu.com/hm.js?be055eb5acfdc25d3bd72279b8418725"; var s = document.getElementsByTagName("script")[0]; s.parentNode.insertBefore(hm, s); })();